I have a remediation project ongoing that is dynamic and has a ticketing connection. After creating this project there were 4 solutions that needed to be addressed by the owner of the machine.
After the tickets were created the machine owner solved the findings and now the status of the remediation project progress is set to 100% (4 of 4). What happens if the remediation project gets a new finding? (4 of 5), or will this not change because the remediation project has reached his 100% or will this change to 80% (4 of 5).